zielsicher Englisch, Bautechnik, Schulbuch

Match the description of setting up a drywall to the pictures showing the workflow. Then, mark the keyverbs, and write them into your exercise book plus, translate them. 1 Clamp mineral wool between the CWstuds to achieve a good sound and thermal insulation. 2 Mount the first plasterboard using drywall screws. 3 Mount the second wall side starting with half of a plaster board and finish the wall. 4 Mark the course of the wall on the floor and on the ceiling. Don’t forget to mark the doorways. 5 Twist CWstuds into position in ceiling/ floor tracks and attach them to the wall by three points at least. Keep in mind a required centre distance of half the width of the board. 6 Finally, fill the board joints with joint filler and apply plaster onto the boards according to the four quality levels. 7 Cut the UWchannels to size with a pair of metal shears and fix them with rotary pin dowels onto the floor and ceiling. Mosaic A wall made of plasterboard looks like a big puzzle: Take a sheet of paper and cut it into pieces. Is your colleague able to make it whole again? 02 A2 Tip Special info: 1 After having fixed the UWchannels, glue a selfsealing strip to the channels for optimal sound insulation. Special info: 2 The installation work is carried out by plumbers and electricians. All electrical cables are guided through holes in the studs. Word bank clamp einklemmen mount anbringen course Verlauf doorway Türöffnung twist drehen fix befestigen attach verbinden centre distance Achsabstand half the width of halbe Breite fill ausfüllen, „ausdrücken“ joint filler Fugenfüller cut to size zuschneiden metal shears Blechschere 5 4 6 1 3 7 2 129 Drywalls 30 Nur zu Prüfzwecken – Eigentum des Verlags öbv

RkJQdWJsaXNoZXIy ODE3MDE=