zielsicher Englisch, Bautechnik, Schulbuch

Name four formwork components. 1. formwork sheets 3. framed formwork 2. beams 4. floor props Answer the following questions: 1. Which element links two panels? clamp 2. Which system makes sure that the formwork cannot deform? tie rod system 3. How can you increase the height of the formwork. waling 4. From which place concrete is poured in? pouring platform Put the steps of setting up a wall formwork into the correct order. 5. Pour in the concrete and compact it if necessary 6. Strip out the formwork after the concrete has set. 1. Draw a line on the ground along which you want to set up the formwork system. 4. Close the framework using the tie rod system. 3. Position the reinforcement elements according to the given layout. 2. Join the framed formwork panels using clamps and oil the panels. There are two ways of setting up a formwork. Please explain. 1. Construction workers build the shuttering with formwork sheets or timber on the building site. 2. The shuttering is prefabricated from metal or plastic and brought to the construction site ready to use. 11 A2 12 A2 13 A2 14 A2–B1 What I can now do: ●● I can name formwork components.  ➤ 11 Ich kann Schalungsbaukomponenten nennen. ●● I can identify terms needed to understand the layout of a framed formwork.  ➤ 12 Ich kann Begriffe anwenden die notwendig sind, um eine Anordnung einer Rahmenschalung zu verstehen. ●● I can report the steps of setting up a wall formwork.  ➤ 13 Ich kann die Arbeitsschritte zur Erstellung einer Wandschalung wiedergeben. ●● I can define two ways of setting up a formwork.  ➤ 14 Ich kann zwei Arten definieren eine Schalung einzurichten. 27 Formwork Check yourself 119 Nur zu Prüfzwecken – Eigentum des Verlags öbv

RkJQdWJsaXNoZXIy ODE3MDE=